2008-01-23
Diary Of 2008-01-23
In the moring, I had nothing, so l was lying on the bed and listen the lesson 9 of the New Concept English book until nine-thirty. After I got up, I opened the my notebook, continue to listen the english, and begun to get on the internet. I used the google to search "how to study the New Concept Engish" and read the articles, at the 12 o'clock, Terry, my colleague, who was on the msn to ask me the work during the afternoon, and I told him that we would meet in the HengTong Building at eleven-thirty. after we arrived here, we begun to deploy that we had developed the web application to the machine of the ShangHai Metro Operation Centre, but my notebook don't recognize all USB Pans, So I had to try to copy the web app into the Mobile HardDisk , but the target machine don't recognize my HD, sigh! at the result, I copied the data into the mobile hd, and from the mobile hd to my co-worker's pc and from that pc to the USB Pan, finally from the USB Pan to the target server.
In the Machinery Room of the Metro Centre, the noise of the server is very large!, it sounds so engine of the plane, and radiation, high temperature(in the winter, the air conditioner must to open the cold level), if somone stay one hour at this room, his life-span could to be reduced a month! but we found a NB man, he stay and don't move a little between the two machine cabinets in this whole afternoon.
After some hours, we complete to deploy the app and setting the required data in the server of the Metro Centre, we had intended to test my program with the employee of our custom. but this time has five o'clock and they has gotten off work. so we had to continue our work tomorrow.
In the Machinery Room of the Metro Centre, the noise of the server is very large!, it sounds so engine of the plane, and radiation, high temperature(in the winter, the air conditioner must to open the cold level), if somone stay one hour at this room, his life-span could to be reduced a month! but we found a NB man, he stay and don't move a little between the two machine cabinets in this whole afternoon.
After some hours, we complete to deploy the app and setting the required data in the server of the Metro Centre, we had intended to test my program with the employee of our custom. but this time has five o'clock and they has gotten off work. so we had to continue our work tomorrow.
发表评论
- 浏览: 264768 次
- 性别:

- 来自: 杭州

- 详细资料
搜索本博客
我的相册
t61 thinkpad
共 143 张
共 143 张
最近加入圈子
链接
最新评论
-
使用Dorado框架开发必备参 ...
哈哈,顶,收藏了啊
-- by liufeikl2008 -
使用Dorado框架开发必备参 ...
谢谢了,收藏啦!!期望更新中
-- by liufeikl2008 -
在云南做项目的日子――20 ...
波xx,咪xx全家..
-- by Diablofrog -
在云南做项目的日子――20 ...
太漂亮了..无法用言语形容了.....
-- by xiaozmn -
jBPM中Timer的使用
引用楼主使用没有发现什么问题吗?为什么我在用的时候,线程启动成功后,倒是执行了, ...
-- by macrochen






评论排行榜